AC Muslim Bagh Inspects Progress on 14km N-50 Highway Development Project

0 3

Independent Report

Muslim Bagh:
Assistant Commissioner Muslim Bagh, Deharaj Kalara, conducted a detailed inspection of the 14-kilometre road project on the N-50 Highway from Marzghan to Loralai, reviewing key development works underway in the sub-division. SDO Abdul Kareem and technical experts from the Highways Department accompanied him during the visit.

The AC and his team examined various components of the project, including sub-base and base course work, the drainage system, blacktopping, and the construction of protective retaining walls. Engineers briefed the AC, stating that the project is progressing rapidly and in full compliance with approved quality standards.

Assistant Commissioner Kalara thoroughly inspected the quality, pace, and materials being used, issuing strict instructions that no substandard work or poor-quality material will be tolerated. He emphasized that the project holds significant importance for public convenience and regional development; therefore, transparency and quality must remain uncompromised.

Upon completion, the road is expected to make travel between Muslim Bagh, Marzghan, and Loralai smoother and safer, while also boosting local trade and connectivity. SDO Abdul Kareem assured that all technical phases are being executed in accordance with international standards and that the project will be completed within the stipulated timeframe.

The AC directed officials to submit daily progress reports and ensure that this public-interest project is delivered with excellence.

Leave A Reply

Your email address will not be published.